Gujarat - Monthly installed capacity of power stations

52,738 (Megawatts) in April 2024

In April 2024, monthly installed capacity of power stations for Gujarat was 52,738 megawatts. Monthly installed capacity of power stations of Gujarat increased from 46,776 megawatts in May 2023 to 52,738 megawatts in April 2024 growing at an average annual rate of 1.12%.

The description is composed by our digital data assistant.