Lovech - Volume of metal ores loaded

196 (Thousand tonnes) in 2015

In 2015, volume of metal ores loaded for Lovech was 196 thousand tonnes. Though Lovech volume of metal ores loaded fluctuated substantially in recent years, it tended to increase through 2009 - 2015 period ending at 196 thousand tonnes in 2015.

The description is composed by our digital data assistant.

Activate Professional to get unlimited access to more than 11.1b time series and visualizations

Go Professional

What is Lovech volume of metal ores loaded?