The production of phosphate rock in Senegal

587,216 t in 2019

Since 2005, the production of phosphate rock of Senegal fluctuated between a low of 500,126 t in 2018 and a high of 2.2 million t in 2016 averaging at 942,156.13 between 2005 and 2019.

The description is composed by our digital data assistant.
The production of phosphate rock in Africa
Egypt 5,000,000 t in 2016 FAO
Tunisia 3,660,000 t in 2016 FAO
Algeria 1,270,000 t in 2016 FAO
Botswana t in 2019 FAO
Ghana t in 2019 FAO
Mauritius t in 2019 FAO
The phosphate production in Senegal
Superphosphate 27,853 t in 2007 FAO